A vessel provision list should calculate food and drinking water demand from crew numbers, days until the next confirmed resupply, menus, dietary needs, usable stock, storage capacity and justified allowances. Convert these inputs into item quantities, pack sizes and delivery requirements; Albatros Ship Supply & Technical Services provides provision supply in Turkey’s ports.

What is a vessel provision list?

A vessel provision list is an itemised requisition for the food, beverages and related catering supplies needed aboard a ship during a defined period. Each line should specify the product, purchase unit, quantity, storage category and any dietary or substitution restrictions.

For a chief cook, the list translates the menu into ingredients. For a purchasing team, it defines what to quote and order. For the receiving crew, it provides a reference for checking the delivery.

The planning period should end at the next reliable replenishment opportunity. A port call alone does not confirm that an order can be delivered.

What should be calculated in a vessel provision list?

Calculate demand, subtract usable supplies and check whether the resulting order can be stored and served as planned. Use the following inputs-and-outputs table as a working structure for ship provisions planning.

Planning input What to establish Output for the provision list
Crew count People requiring meals each day, including scheduled crew changes Daily meal counts and separate dietary-group counts
Voyage length Days until confirmed resupply, including relevant port or waiting periods Coverage period and an explicitly justified contingency
Menu cycle Dishes, serving frequency, recipe quantities and expected portions Ingredient demand for each menu item
Stock on hand Physical quantities, condition, remaining shelf life and stock already committed Usable inventory available during the planning period
Storage Available chilled, frozen and dry space after existing stock is considered Feasible delivery quantities, pack sizes and storage allocation
Dietary needs Religious and cultural preferences, allergies and medically required diets Product specifications, suitable alternatives and substitution restrictions
Waste allowance Documented preparation yield and avoidable loss observed on the vessel A justified adjustment, without duplicating allowances
Delivery arrangements Port, berth or anchorage, ETA, delivery window and receiving contact An RFQ that identifies where and when supply is required

Do not treat crew count as a universal food multiplier. A marine provisions list must reflect the actual menu, people aboard and replenishment plan.

How do you build the list step by step?

Build the list by turning the meal plan into purchasing quantities, then reconciling inventory, storage and delivery constraints.

1. Confirm the people and coverage period

Record who will eat aboard and for how long. Include joining and leaving crew, and account for other people being catered for where relevant.

Crew-days can help compare planning periods. For example, 20 crew over 14 days equals 280 crew-days. This is an illustrative planning calculation, not a prescribed food allowance. Item demand still depends on recipes, meal schedules and dietary groups.

2. Translate the menu cycle into ingredient demand

List the meals and snacks planned for the coverage period. Calculate ingredients from the vessel’s approved recipes and expected servings, using units that can be reconciled with purchasing packs.

A product used in several dishes should appear as one consolidated requirement. Keep special-diet ingredients identifiable so that a general replacement cannot accidentally remove a necessary option.

For an item with preparation loss, distinguish the usable ingredient weight required by the recipe from the purchased weight. Use the vessel’s documented yield rather than an invented percentage.

3. Reconcile usable stock and confirmed incoming supplies

Count physical stock before ordering. Check that it can remain suitable until its planned use; damaged, expired or otherwise unsuitable products should not reduce the purchase requirement.

For each item, use this planning relationship:

Purchase requirement = menu demand + justified reserve − usable stock − confirmed incoming supplies.

Keep all quantities in the same unit and use zero where the result is negative. Subtract an incoming delivery only if its specification and arrival timing make it usable within the planning period.

If preparation loss is already included in menu demand, do not add it again as a blanket waste factor.

4. Check storage, shelf life and pack sizes

The order must fit the vessel’s usable storage capacity, including the space occupied by packaging and existing supplies. Assess chilled, frozen and dry categories separately.

Round quantities to available packs only after calculating demand. Then repeat the storage check: a rounded order may exceed available space or leave excess perishable stock.

Plan when each product will be used. Where storage or shelf life limits coverage, consider suitable alternatives or a confirmed staged replenishment rather than overloading stores.

5. Specify diets and substitutions

Dietary requirements should become purchasing instructions. State the relevant ingredient exclusions, labelling or certification requirements and whether substitutions require approval.

For allergies, identify the information needed about ingredients and cross-contact before approving a product. A broad label such as “special diet” does not give the supplier enough detail.

Separate a preferred brand from a mandatory specification. This allows quotations to identify acceptable options without treating every difference as interchangeable.

6. Finalise the RFQ and receiving reference

Issue a dated list with a revision number, clear quantities and a named contact for questions. Give each line an unambiguous unit, such as kilograms, litres, pieces or cases with the case contents stated.

Keep the final order and receiving checklist aligned. At delivery, reconcile products and quantities, check condition and relevant storage requirements, and record discrepancies before the supplies enter normal stock.

These are planning recommendations; the vessel’s procedures determine approvals and acceptance criteria.

How does MLC 3.2 affect provision planning?

MLC Regulation 3.2 and Standard A3.2 establish food and catering requirements for seafarers, including suitable food and drinking water, balanced meals and hygienic preparation. Standard A3.2 connects supply suitability to crew numbers, religious and cultural requirements, and the duration and nature of the voyage.

The ILO consolidated text, published on 2 October 2024 and including the 2022 amendments, also requires frequent documented onboard inspections covering supplies, storage and handling spaces, and galley equipment. It does not prescribe a universal kilogram allowance per person. Apply the flag State’s implementing requirements alongside the vessel’s catering procedures. Source: ILO, Regulation 3.2 and Standard A3.2.

The 2022 amendments entered into force on 23 December 2024. Source: ILO amendment record.

Which exceptions require the list to be revised?

Revise the list when the assumptions behind demand, usable stock or replenishment change.

An extended voyage or uncertain next delivery may require additional coverage. A crew change may alter both meal counts and dietary requirements. Reduced refrigeration capacity may require smaller deliveries or a different menu.

Separate delay reserves from expected waste. A reserve addresses uncertainty in coverage; a waste adjustment addresses documented product loss. Neither justifies retaining unsuitable food or automatically increasing every item by the same percentage.

If a substitution changes allergens, recipe yield, pack size or storage needs, recalculate the affected lines before approving it.

What should you check before requesting a quote?

Check that the list is both measurable and deliverable.

  • Confirm daily headcount, dietary groups, menu coverage and the next reliable resupply.

  • Reconcile usable stock, confirmed incoming supplies and documented allowances.

  • Specify product descriptions, units, pack contents and substitution restrictions.

  • Check chilled, frozen and dry capacity against quantities and expected use dates.

  • Confirm the port, delivery location, ETA, required window and receiving contact.

How can Albatros support provision supply in Turkey?

Albatros Ship Supply & Technical Services supplies fresh, frozen and dry provisions to vessels calling at Turkish ports. Its official provision service describes purchasing through onboard delivery, planning around route, ETA and storage capacity, and inspections before dispatch. Source: Albatros Provision Supply & Management.

For a call in Istanbul, the relevant Albatros port page describes provision planning around crew profiles and storage limits, including special dietary requirements. Identify the actual terminal or authorised anchorage when discussing the order; delivery arrangements remain subject to local rules. Source: Albatros Istanbul port page.

Use Albatros’s Service Areas page to identify the intended Turkish port and discuss the specific call before finalising supply. Albatros Service Areas.

Frequently asked questions

What should be calculated in a vessel provision list?

Calculate menu-based demand for the people aboard until the next confirmed resupply. Reconcile usable stock and confirmed incoming supplies, then account for diets, preparation yield, justified reserves, pack sizes and storage limits. The result should be an itemised purchase requirement.

How much food should be ordered per crew member?

There is no universal per-person quantity suitable for every vessel. Use the vessel’s recipes, meal counts, consumption records and dietary needs to establish demand. MLC Standard A3.2 requires suitable quantity, quality, nutritional value and variety in relation to the crew and voyage.

How should waste and delay allowances be included?

Use documented preparation yields and loss records to justify waste adjustments. Treat a delay reserve separately, based on the replenishment plan and operational uncertainty. Check that allowances are not counted twice and that additional supplies remain suitable and fit the vessel’s storage.

What should be sent with a provision supply RFQ?

Send the itemised list with quantities, units, pack sizes, dietary specifications and substitution rules. Include vessel identification, the Turkish port and delivery location, ETA, the required delivery window and a receiving contact. State the planned coverage period and attach relevant requirements.

Request a provision supply quote

Send Albatros your vessel provision list for the next port call in Turkey. Include crew numbers, coverage days, dietary needs and storage constraints so the request describes both the products and the operational context.

Albatros’s Get a Quote form includes vessel details, port, ETA, ETB, ETD, a requirements message and document uploads. Submit your provision supply RFQ.

Planning and source review: 7 October 2026.